Cowabunga Bay

Hydro-Arch constructed the walls of the Wave Pool Equipment Building utilizing the shotcrete process. Fixed road elevations created severe size constraints for the storm drain system. Hydro-Arch’s engineer ES2 designed a low, wide arch structure that met the heavy flow requirements and fit easily within the size constraints.

Location:

Henderson, NV

Owner:

Splash Management, LLC

Structural Engineer:

Aquatic Development Group, INC

General Contractor:

R&O Construction Company

Governing Agency:

City of Henderson